How a renovation runs

Every week has a job. Here is each one.

A typical eight-week kitchen, week by week: what happens, who is in your home and what you need to decide. Click a week to see it.

Week 0 of 8 · on site: Project manager

Before we start

Permits issued, materials with long lead times ordered, neighbours told, a start date confirmed.

02

Four stages, clear exits.

You can stop after any stage and keep what was made for you.

01Discover

A site visit, measurements, and the questions that change the price.

  • 60 minute visit: measure, photograph, check moisture, panel and plumbing.
  • We talk about how you use the room, not just how it looks.
  • You leave with a list of unknowns and who checks each one.
02Design

Drawings, a 3D concept and a fixed-scope proposal.

  • Measured floor plan and 3D concept of the new room.
  • Finish selections with real samples on site.
  • Fixed-scope proposal with an itemised budget and a schedule. You can stop here and keep the drawings.
03Build

One site lead, a weekly plan, and no surprise invoices.

  • Dust walls, floor protection and a clean site every day.
  • A written plan every Monday: who is on site and what gets done.
  • Changes are priced in writing before anyone does the work.
04Hand over

A walkthrough, a binder, and a check-in later on.

  • Walkthrough with a deficiency list, fixed before final payment.
  • Binder with warranties, paint codes, product care.
  • A follow-up visit after the first season.
A gloved hand marking a measurement on timber with a pencilReference photo, Pixabay

Living through it

Dust walls, a temporary kitchen, a Monday plan.

Most families stay home during a single-room renovation. We seal the work area, run air scrubbers on drywall days and send a written plan every Monday.