Service · 8 to 20 weeks on site
One plan, one crew, one schedule.
When the wiring, plumbing and floors all need work, doing it once saves money and months. We sequence the trades so the house is open for as short a time as possible.
Reference photo, Pixabay. Not a Hartwell project.01 What is included
- Main floor and multi-room renovations
- Panel upgrades and rewiring
- Flooring, trim and paint throughout
- Kitchens and bathrooms in one project
02 What changes the price
- Older homes may need hazard testing
- You will likely need to move out for part of it
- Structural changes need an engineer
Budget guideIllustrative
Illustrative range: about CA$120 to CA$250 per sq ft.
Fictional sample figures for a Calgary-style market.
Concept renderDemo project profile
Aspen Close main floor
A 1970s main floor rebuilt around one open kitchen, with new wiring, a new panel and porcelain floors throughout.
Read the plan and scheduleCommon questions
Who pulls the permits?
In a real Hartwell project we would apply for building, plumbing and electrical permits where the work needs them and book the inspections. Cosmetic work like paint, cabinet doors or new counters usually needs no permit.
How long will we be without a kitchen?
For a typical kitchen, about 5 to 8 weeks. We set up a temporary kitchen with a sink, a fridge and a counter in another room when the family stays home.
Can we live at home during the renovation?
For most single-room projects, yes. Dust walls, a separate entry for crews where possible and daily clean-up make it workable. Whole-home projects usually mean moving out for part of the schedule.
What happens if you find something behind the walls?
Work on that part stops, we photograph it, explain the options and price the change in writing. Nothing extra is done without your signature. That is why every estimate carries a contingency.