HartwellRenovations · Demo

Kitchen · 220 sq ft (20.4 m²) · Demo project, not a real client

Larch Street kitchen

A closed 1990s kitchen opened up: the pantry wall comes out, an island goes in, the sink stays under the window.

Concept render of the room as found
Concept render after: Sage shaker, white quartz, brass
BeforeAfter

Drag the crossbar or use the arrow keys. Both views are concept renders of the same demo room from the same camera.

01 Brief

Two adults who cook most nights wanted room for a second person at the counter and a place for kids to do homework while dinner happens. The old kitchen had good bones and a bright window, but a pantry wall boxed in the fridge and cut the room in half.

02 Constraints

  • Keep the sink under the existing window so the drain stack does not move.
  • The pantry wall is assumed non-load-bearing in this concept. A real project confirms that on site before anything is priced.
  • Family stays in the house: a temporary kitchen goes in the dining room for the build.
  • Budget ceiling set before design, with a 15 to 18 percent contingency held back.

03 Plan

  1. Remove the pantry wall and patch ceiling and floor.
  2. Back wall: range centred under a vented hood, deep drawers either side.
  3. Tall column for an integrated fridge and pantry at the end of the run.
  4. A 2.40 × 1.00 m island with three seats and a 1.00 m walkway all round.
  5. New engineered white oak floor through the whole room, pendants over the island.

04 Example schedule

  1. Week 1

    Protect and remove

    Dust walls, floor protection, temporary kitchen set up, cabinets and drywall out.

  2. Week 2

    Open and inspect

    Pantry wall removed. Plumber and electrician rough-in. City inspection booked.

  3. Week 3

    Close up

    Insulation where needed, drywall, tape and first paint coat.

  4. Weeks 4 to 5

    Floor and cabinets

    Oak floor laid, cabinets set level, island anchored.

  5. Week 6

    Templates and counters

    Quartz templated, cut off site, installed in one day.

  6. Week 7

    Finish

    Tile, fixtures, hardware, final paint, walkthrough and deficiency list.

A transparent example, not a promise. Lead times, inspections and what we find in the walls move dates.

05 Visuals

Concept render of a sage green kitchen with a white quartz island and brass pullsConcept render
After, concept render. Same room, same camera as the before view.
Concept render of the kitchen opened to the studs with plumbing and wiring visibleConcept render
Opened to the studs. The plumbing wall stays where it is.
Concept render of the bare room with the new cabinet and island outlines marked on the subfloorConcept render
New footprints marked on the subfloor before anything is built.
Concept render of the finished kitchen at night with pendants litConcept render
Evening light: pendants, strip lights under the uppers.
A framing square held against timber studsReference photo
Reference photo of framing work (Pixabay). Not from this project.

06 Itemised, illustrative

Where the money goes.

Ranges by trade from the same demo rule table the Scoper uses. Exclusions are listed so nothing is hidden.

  • Not included: Appliances (allowance shown separately if you add them)
  • Not included: Structural beams or engineering
  • Not included: Asbestos or mould abatement
  • Not included: Window replacement
  • Not included: Furniture and decor
ItemLowHigh
Demolition and protectionCA$4,300CA$5,500
Framing, drywall, paintCA$7,800CA$10,100
PlumbingCA$7,100CA$9,200
Electrical and lightingCA$7,100CA$9,200
Cabinets and installCA$21,400CA$27,600
CountersCA$7,800CA$10,100
Backsplash tileCA$3,600CA$4,600
FlooringCA$5,700CA$7,300
Project managementCA$6,400CA$8,300
Allowance: Permits and inspectionsCA$1,900CA$1,900
Allowance: Waste bin and disposalCA$1,100CA$1,100
Allowance: Opening a non-load-bearing wallCA$7,400CA$7,400
Contingency (18%)CA$14,700CA$18,400

Planning something like this?

Start with a scope you can question, then a site visit.