01 Brief

A household that entertains often wanted the cook to face guests instead of a wall. The plan puts all storage and the range on the back wall and turns the island into the working centre of the room.

02 Constraints

  • Moving the sink to the island means a new drain run under the floor. Joist direction decides the route, so this is checked first.
  • Soapstone slabs are usually about 2.1 m long: the island top has one planned seam.
  • Open shelves on the side wall replace upper cabinets, so everyday dishes need a home in deep drawers.

03 Plan

  1. Back wall run with range, hood and tall fridge column.
  2. 3.20 × 1.00 m island with the sink, dishwasher and four seats.
  3. Two oak shelves on the window wall.
  4. Engineered walnut floor.

04 Example schedule

  1. Week 1

    Remove

    Cabinets, counters and flooring out, plumbing capped.

  2. Week 2

    New drain run

    Island drain and vent run under the floor, rough-in inspection.

  3. Weeks 3 to 4

    Walls and floor

    Drywall repairs, paint, walnut floor laid.

  4. Weeks 5 to 6

    Cabinets

    Wall run and island set, shelves hung.

  5. Week 7

    Stone

    Soapstone templated with the seam marked, installed and oiled.

  6. Week 8

    Finish

    Fixtures, appliances, hardware, walkthrough.

A transparent example, not a promise. Lead times, inspections and what we find in the walls move dates.

05 Visuals

Concept render of an oak kitchen with a long soapstone island and black pullsConcept render
After, concept render.
Concept render of the oak kitchen at nightConcept render
Evening light on oak and soapstone.
Concept render of the long island from a side angleConcept render
Side view of the island, four seats.
A chisel resting on a cut timber jointReference photo
Reference photo of joinery (Pixabay). Not from this project.

06 Itemised, illustrative

Where the money goes.

Ranges by trade from the same demo rule table the Scoper uses. Exclusions are listed so nothing is hidden.

  • Not included: Appliances (allowance shown separately if you add them)
  • Not included: Structural beams or engineering
  • Not included: Asbestos or mould abatement
  • Not included: Window replacement
  • Not included: Furniture and decor
ItemLowHigh
Demolition and protectionCA$7,200CA$9,300
Framing, drywall, paintCA$13,200CA$17,000
PlumbingCA$12,000CA$15,400
Electrical and lightingCA$12,000CA$15,400
Cabinets and installCA$35,900CA$46,300
CountersCA$13,200CA$17,000
Backsplash tileCA$6,000CA$7,700
FlooringCA$9,600CA$12,300
Project managementCA$10,800CA$13,900
Allowance: Permits and inspectionsCA$1,900CA$1,900
Allowance: Waste bin and disposalCA$1,200CA$1,200
Allowance: Moving plumbing or gas a short distanceCA$3,800CA$3,800
Contingency (15%)CA$19,000CA$24,200